◎ We Deliver Worldwide
🚚 Global Shipping Available
↩ 30-Day Easy Returns
🛡 Secure Checkout
◉ 24/7 Support
Type C  Cable 3A 60W Fast Charger Braided Long Lead

Type C Cable 3A 60W Fast Charger Braided Long Lead

★★★★★
£22.99

Charge your devices quickly and reliably with this USB Type-C 3A 60W Fast Charging Cable. Built with a durable braided exterior, it resists tangling and everyday wear while delivering fast charging and stable data transfer. The long cable provides extra flexibility, making it ideal for use at home, in the office, or while travelling. Compatible with a wide range of USB-C smartphones, tablets, laptops, power banks, and other devices.

Key Features:

Supports up to 60W (3A) fast charging
Durable braided nylon cable for enhanced strength
High-speed charging and reliable data transfer
Long cable for added convenience and flexibility
Reinforced connectors for improved durability
Tangle-resistant and wear-resistant design
Compatible with USB Type-C smartphones, tablets, laptops, power banks, and other USB-C devices

Package Includes:

1 × USB Type-C 3A 60W Braided Fast Charging Cable

🛡 Secure transaction

🚚 Global delivery options

↩ Easy returns